| ||||||||||||||||||||
| General data | |
| Type: | BWR | |
| Boiling Water Reactor | ||
| Capacity Net: | 1067 MW | |
| Gross Net: | 1100 MW | |
| Status: | Connected | |
| Operator: | TEPCO | |
| NSSS Supplier: | GE | |
| Location of the unit | ||||||||||
| Country: | JAPAN
| ||||||||||
|
| Latitude:
| 37 : 25 : 0 : N
|
| Longitude:
| 141 : 2 : 0 : E
|
| Distance from Ljubljana:
| 9313 km
| | ||
| Important dates: | |
| Construction Start: | 10.1973 | |
| Grid connection: | 5.1979 | |
| First criticality: | 3.1979 | |
| Commercial operation: | 10.1979 | |
| Expected shutdown date: | 10.2019 | |