| General data | |
| Type: | PWR | |
| Pressurized Water Reactor | ||
| Capacity Net: | 1455 MW | |
| Gross Net: | 1520 MW | |
| Status: | Under Construction | |
| Operator: | EDF | |
| NSSS Supplier: | FRAM | |
| Location of the unit | ||||||||||
| Country: | FRANCE
| ||||||||||
|
| Latitude:
| 46 : 27 : 27 : N
|
| Longitude:
| 0 : 39 : 33 : E
|
| Distance from Ljubljana:
| 1064 km
| | ||
| Important dates: | |
| Construction Start: | 4.1993 | |
| Grid connection: | 3.2000 | |
| First criticality: | 11.1997 | |
| Commercial operation: | 9.2000 | |
| Expected shutdown date: | 9.2040 | |